Program Design and Development MCQ Practice

Question 1 of 10

A team building a campus food-share app interviews diner staff, sketches screens, builds a clickable prototype, then runs a cafeteria pilot.

Which development process description best fits this sequence?

  1. A. Investigating needs, designing, prototyping, then testing with users
  2. B. Only writing documentation after the project is abandoned
  3. C. Randomly changing features with no reflection
  4. D. Skipping investigation and shipping binary code first

Question 2 of 10

For a hallway noise-meter project, students release version 0.1 that only shows a live reading. Version 0.2 adds a daily peak. Version 0.3 adds a classroom comparison chart after teacher feedback.

Which design approach is illustrated?

  1. A. One-shot perfect delivery with no revisions
  2. B. Incremental and iterative development guided by feedback
  3. C. Avoiding prototypes by writing the final chart first
  4. D. Deleting versions so users never see progress

Question 3 of 10

A specification for a lab-equipment checkout tool says: "Students may borrow at most 2 items; overdue items block new loans."

Which implementation detail most clearly fails to meet the specification?

  1. A. The program records return timestamps.
  2. B. The program refuses a third item when two are already out.
  3. C. The program allows a new loan while an overdue item is still out.
  4. D. The program displays a message when a loan is blocked.

Question 4 of 10

A team's design notes for a bike-repair ticket system include:

Phase Artifact
Investigate Interview notes from 5 riders
Design Wireframes of report form
Prototype Working form saving to a test list
Test ???

Which artifact best completes the Test phase for this system?

  1. A. Deleting the interview notes to save space
  2. B. Rewriting the programming language manifesto
  3. C. A brand-new logo file with no user trials
  4. D. A table of trial tickets with expected vs actual saved fields and rider feedback

Question 5 of 10

Why is documentation valuable during program design and development of a shared shift-scheduler?

  1. A. It helps current and future collaborators understand decisions, interfaces, and how to use or modify the program.
  2. B. It guarantees there are zero bugs.
  3. C. It is only useful after the company closes.
  4. D. It replaces the need to ever run the program.

Question 6 of 10

Midway through building a tutoring-match app, user tests show tutors cannot filter by subject. The team pauses new themes and adds filtering next.

Which statement best describes this decision?

  1. A. Themes must always ship before core tasks.
  2. B. Reflection on feedback led to reprioritizing the design backlog.
  3. C. The team abandoned iterative development forever.
  4. D. Filtering is unrelated to program design.

Question 7 of 10

Two design options for a lost-ID reporter:

Option Approach
1 Build every screen before any user sees it
2 Ship a text-only report form this week, then add photo upload after trials

Which option better matches iterative development, and why?

  1. A. Option 1, because photo upload is impossible to add later.
  2. B. Option 1, because users should never influence design.
  3. C. Option 2, because a smaller working slice can be tested and improved before expanding.
  4. D. Neither, because iteration forbids releasing anything.

Question 8 of 10

A student writes a module that computes late fees but leaves no comments and names variables a, b, c.

In a team setting, what design-and-development problem does this primarily create?

  1. A. The computer refuses to run any uncommented program.
  2. B. Late fees become illegal.
  3. C. Variable names must be single letters by CSP rules.
  4. D. The module becomes harder for others to understand, review, and safely modify.

Question 9 of 10

Which activity belongs earliest when designing a new community-garden watering reminder?

  1. A. Investigating when gardeners forget to water and what reminders they would trust
  2. B. Buying billboard ads for a finished product
  3. C. Deleting prototypes so only the final binary remains
  4. D. Polishing animation timing for the trophy screen

Question 10 of 10

A prototype of a study-timer intentionally hard-codes three subject names to test the timing logic before connecting a full course database.

Why can this still be good design practice?

  1. A. Hard-coding always produces the final production system.
  2. B. A narrow prototype can validate core timing behavior quickly before investing in full data integration.
  3. C. Databases are never used in real programs.
  4. D. Prototypes must include every feature on day one.