Collaboration MCQ Practice

Question 1 of 10

A team is building a cafeteria wait-time app. Maya writes the line-length estimator while Jordan writes the display screen. They only merge work on Friday, and each Friday the display crashes because Jordan assumed a field name Maya renamed on Wednesday.

Which collaboration change most directly reduces this class of failure before Friday?

  1. A. Agree on shared data field names in a short written interface note and sync daily on a shared repository.
  2. B. Ask the cafeteria manager to rename menu items so field names never change.
  3. C. Disable the display screen until the final exam week so crashes are invisible.
  4. D. Finish all coding alone, then meet once to present slides about naming.

Question 2 of 10

Four students pair-program on a ticket-scanner module. Pair roles rotate every 25 minutes. After two rotations, only one student has ever typed; the others only watched.

Which adjustment best restores the intended benefit of pair programming for this module?

  1. A. Require the non-typing partner to remain silent to avoid interrupting flow.
  2. B. Enforce role switches so each student spends time as both driver and navigator.
  3. C. Split into four solo branches and delete the shared repository.
  4. D. Keep the same typist so the module finishes faster and looks consistent.

Question 3 of 10

A club is designing a lost-and-found matcher for campus. The initial user stories come only from three seniors who never lose items. Midway, a first-year student who frequently loses earbuds joins a feedback session and reports that photo zoom and multilingual labels matter more than the seniors expected.

What is the strongest reason to revise the design after this session?

  1. A. Photo zoom is a required College Board exam feature for every app.
  2. B. Multilingual labels make collaboration unnecessary because users teach themselves.
  3. C. Diverse user perspectives can reveal requirements that a narrow team overlooks.
  4. D. First-year students are always correct, so seniors should never contribute stories.

Question 4 of 10

A shared issue board for a weather-alert program shows the following open items:

ID Owner Status Blocked by
17 Asha In progress none
18 Ben Blocked waiting on Asha API shape
19 Cam Ready none
20 Ben Blocked waiting on school network key

The team has one afternoon left before a demo. Which collaboration plan best uses the board?

  1. A. Delete items 18 and 20 so the board looks empty for the demo.
  2. B. Asha pauses item 17 and instead rewrites Cam's ready work from scratch.
  3. C. Ben idles on both blocked items while Cam starts unrelated personal projects.
  4. D. Asha publishes a temporary API shape so Ben can unblock 18; Cam starts 19; Ben escalates 20 to the network admin with a written request.

Question 5 of 10

During a code review for a volunteer-hours tracker, Priya notices that Diego copied a sorting procedure from an open tutorial without citing it in the program comments or project README.

Which response best reflects effective collaborative professional practice?

  1. A. Ask Diego to add an acknowledgment of the tutorial source in the documentation and confirm the license allows reuse.
  2. B. Delete Diego from the repository permanently without discussion.
  3. C. Replace the procedure with a slower one so originality is guaranteed by inefficiency.
  4. D. Ignore the omission because citation only matters for printed essays.

Question 6 of 10

Two developers disagree about whether a museum audio-tour app should download all exhibit audio at launch or stream per room. They argue for 40 minutes with no decision, and neither writes a short experiment.

Which collaborative next step is most productive?

  1. A. Flip a coin and forbid further discussion forever.
  2. B. Each builds a tiny prototype for one approach, then compare measured launch time and user feedback on a shared table.
  3. C. Ask a random hallway student to decide without hearing either argument.
  4. D. Ship both approaches at once in the same button so users must choose every tap.

Question 7 of 10

A remote team maintains a bus-arrival notifier. Their chat log shows:

Time Message
10:02 Lee: Pushing GPS parser changes now.
10:05 Sam: I just rewrote the same parser locally; merging.
10:07 Repo: MERGE CONFLICT in gps_parser
10:08 Sam: I force-kept my file and deleted Lee's comments.

Which collaboration failure is most clearly illustrated, and what fix addresses it?

  1. A. Failure: chatting instead of email; Fix: ban chat tools.
  2. B. Failure: having two developers; Fix: only one person may ever touch code.
  3. C. Failure: simultaneous edits without communication; Fix: announce intent before overlapping edits and resolve conflicts by combining needed changes, not silent overwrites.
  4. D. Failure: using GPS at all; Fix: remove location features from every app.

Question 8 of 10

A nonprofit asks student developers to consult a reading specialist while designing a literacy practice game for early readers. The specialist is available for one 30-minute call.

Which preparation best uses that collaborative consultation?

  1. A. Ask only whether purple or green buttons look nicer.
  2. B. Skip the call and email a finished app afterward for a rubber-stamp approval.
  3. C. Arrive with no questions so the specialist can speak freely about any topic.
  4. D. Bring a working clickable prototype, a short list of reading-level concerns, and note-taking roles so advice can change concrete design choices.

Question 9 of 10

In a group project for a plant-watering reminder, every member claims credit for the final demo, but the commit history and meeting notes show only two members produced code, tests, and user interviews.

Which practice would have best prevented this credit conflict?

  1. A. Maintain shared contribution notes that list who owned interviews, code modules, and tests, and review them before the demo.
  2. B. Assign all credit to the loudest presenter.
  3. C. Hide the repository from the teacher.
  4. D. Keep no records so memory decides credit later.

Question 10 of 10

A team building a peer-tutoring scheduler receives conflicting stakeholder requests: counselors want mandatory study-hall blocks; students want optional drop-in only. The team must ship a first version in one week.

Which collaborative decision process best balances the constraints?

  1. A. Ignore both groups and invent a third schedule with no feedback path.
  2. B. Facilitate a short joint review, document tradeoffs, ship a limited optional pilot with measurable usage data, and schedule a follow-up revision with both groups.
  3. C. Promise every requested feature for day one even if incomplete.
  4. D. Let only counselors vote because they are adults.